Please use this identifier to cite or link to this item: http://repositorio.unicamp.br/jspui/handle/REPOSIP/70453
Type: Artigo de periódico
Title: Production planning using time windows for short-term multipurpose batch plants scheduling problems
Author: Rodrigues, MTM
Latre, LG
Rodrigues, LCA
Abstract: This paper deals with short-time planning and scheduling in multipurpose plants subject to a variable demand profile. In this case, production delays are often due to equipment overload, and this paper addresses a two-level approach that is intended to help managers engineer a scheduling solution that fulfills a compromise between products' demands and plant loading. At the first level, once a product's demand and raw-material delivery plan are defined, backward and forward explosion procedures are developed in such a way that time windows, defined by the earliest starting time and latest finishing time for each batch, are generated. Those time windows are submitted to an extended capacity analysis, based on constraint-propagation mechanisms, which is intended to reduce the time windows. If, after the capacity analysis, the problem is still feasible and the plant loading is accepted, then a scheduling procedure is launched. The scheduling approach is based on a uniform discrete time representation that is intended to explore plant features, such as, zero-wait policies, limited storage; and/or low equipment demand. The mixed integer linear problem (MILP) approach, combined with the time-window shortening procedure at the planning level, leads to smaller MILP problems, thereby reducing the solution time.
Country: EUA
Editor: Amer Chemical Soc
Rights: fechado
Identifier DOI: 10.1021/ie9904551
Date Issue: 2000
Appears in Collections:Unicamp - Artigos e Outros Documentos

Files in This Item:
File Description SizeFormat 
WOS000089733100053.pdf719 kBAdobe PDFView/Open


Items in DSpace are protected by copyright, with all rights reserved, unless otherwise indicated.