Title: Aplicações da curva S e do método do caminho crítico no planejamento de obras
Title Alternative: The S-curve applications and critical path method in planning of engineering works
Author: Costa, Amauri Harvey da, 1954-
Advisor: Gomes Neto, Francisco de Assis Magalhães, 1964-
Abstract: Resumo: Este trabalho tem como proposta apresentar o estudo de um mecanismo prático e de fácil uso para todos aqueles interessados em acompanhar de forma técnica o progresso de um projeto e seu respectivo investimento financeiro. O tema exigiu que desenvolvêssemos de forma didática e organizada todas as atividades envolvidas. Demos ênfase ao planejamento das etapas com o auxílio do caminho crítico obtido através do PERT-CPM, bem como da criação de um cronograma, mostrado pelo Gráfico de Gantt. Tendo em vista que as etapas físicas e os gastos financeiros do projeto estão associados por uma curva em forma de S, estudamos pormenorizadamente como definir uma representação algébrica aproximada para essa curva, para permitir que o executor da obra acompanhe e controle o desenvolvimento do projeto. Com as ferramentas aqui apresentadas, o gerenciamento da obra pode ser realizado de forma integral, permitindo que sejam satisfeitos parâmetros de prazo, custo, qualidade e risco previamente estabelecidos

Abstract: This dissertation aimed at presenting the study of an easy-to-use mechanism to all those interested in technically following the progressive stages a project and its respective financial investiments. The theme demanded us to develop all the activities in a didactical and organized way. Emphasis was given to the planning stages with the aid of the critical path obtained by the PERT-CPM, as well as to the design of a cronogram, showed by the Graphic of Gantt. Considering that the physical stages and the financial expenses of the project are associated by an S-Shaped Curve, we studied in details how to define an approximate algebric representation of this curve, so to allow that the manager of the work can follow and control the development of the project. The tools here presented allow the management of the work in an integral way, so that term, costs, quality and risk parameters previously established are fulfilled
Subject: Métodos de caminho crítico
Administração de projetos
PERT (Análise de redes)
Análise de redes (Planejamento)
Curva S
Editor: [s.n.]
Date Issue: 2017
Appears in Collections:IMECC - Tese e Dissertação