Please use this identifier to cite or link to this item: http://repositorio.unicamp.br/jspui/handle/REPOSIP/262926
Full metadata record
DC FieldValueLanguage
dc.contributor.CRUESPUNIVERSIDADE ESTADUAL DE CAMPINASpt_BR
dc.descriptionOrientador: José Tomaz Vieira Pereirapt_BR
dc.descriptionDissertação (mestrado) - Universidade Estadual de Campinas, Faculdade de Engenharia Mecânicapt_BR
dc.format.extent121 p. : il.pt_BR
dc.format.mimetypeapplication/pdfpt_BR
dc.languagePortuguêspt_BR
dc.typeDISSERTAÇÃOpt_BR
dc.titleAvaliação energética e emergética de usina hidrelétrica - estudo de caso = complexo hidrelétrico de Belo Monte - Rio Xingupt_BR
dc.title.alternativeEnergy and emergy evaluation of hydroelectric power plant - a case study : Belo Monte hydroelectric complex - Xingu Riverpt_BR
dc.contributor.authorMorelli, Mariana Marquespt_BR
dc.contributor.advisorPereira, José Tomaz Vieira, 1944-pt_BR
dc.contributor.institutionUniversidade Estadual de Campinas. Faculdade de Engenharia Mecânicapt_BR
dc.contributor.nameofprogramPrograma de Pós-Graduação em Planejamento de Sistemas Energéticospt_BR
dc.subjectUsinas hidrelétricas - Xingu, Rio (MT e PA)pt_BR
dc.subjectAnálise energéticapt_BR
dc.subjectEmergiapt_BR
dc.subject.otherlanguageHydroelectric power plants - Xingu River (MT, PA)en
dc.subject.otherlanguageEnergy analysisen
dc.subject.otherlanguageEmergyen
dc.description.abstractResumo: A região Amazônica é bastante conhecida por sua riqueza em termos de biodiversidade e de potencial energético advindo de sua extensa rede hidrográfica. Após um vasto histórico de tentativas de barramento de um de seus importantes afluentes -o rio Xingu-, fez-se um projeto para a construção do chamado Complexo Hidrelétrico de Belo Monte (CHE). O principal objetivo deste estudo é apresentar uma metodologia para avaliar um empreendimento hidrelétrico sob os aspectos Energéticos e Ambientais, valendo-se da Análise Energética, que inclui uma avaliação dos fluxos de energia e de emergia. Nesta dissertação o CHE de Belo Monte foi analisado energeticamente, a partir de duas linhas conceituais: a termodinâmica e a emergia. Primeiramente buscou-se dados referentes ao investimento energético no sistema de produção de eletricidade. Em seguida, converteu-se os dados energéticos em exergia e multiplicou-se os resultados obtidos pelas respectivas transformidades: fontes de energia renovável "gratuita" (7,29E+05 sej/ano), fonte de energia renovável comprada (3,12E+03 sej/ano), fontes de energia não renovável comprada (1,39E+05), fontes de energia não renovável "gratuita" (9,40E+06 sej/ano), fontes de energia não renováveis comprada (1,39E+05 sej/ano), energia referente aos impactos ambientais (biomassa perdida, 4,04E+05 sej/ano), energia referente aos investimentos de R$19, 25 e 30 bilhões (5,7E+20, 7,5E+20 e 9E+20 sej/ano). Optou-se por incluir análises considerando estes investimentos financeiros, os quais contemplam os dados do Investimento Físico pesquisados bem como aqueles que não foram possíveis de se quantificar fisicamente, tais como custos ambientais, sociais, alguns materiais e maquinários. A partir destes dados, foram calculados índices emergéticos (EIR, EYR, ELR, ESI e Tr). O CHE de Belo Monte relativamente eficiente mesmo em seu cenário de R$30 bilhões, apresentando valor de Tr igual a 1,35E+04 sej/J. Foi calculado ainda o Índice de Retorno Energético Sobre o Investimento, em duas situações: incluindo ou não a energia não-renovável gratuita (N). Como o EROI depende de todas as entradas energéticas e não particularmente de N, não houve grande diferença entre as duas situações analisadaspt
dc.description.abstractAbstract: This region is well known for its wealth of biodiversity and potential energy that comes from its extensive river system. After a long history of attempts barring one of its major tributaries - Xingu River - , it was conceived a project for building Belo Monte Hydroelectric Complex (CHE). The main goal of this study is to present a methodology for evaluating a hydroelectric project under the Energy and Environmental aspects, using Energy Analysis, which includes an evaluation about energy and emergy flows. In this dissertation CHE Belo Monte was analyzed energetically from two conceptual lines: thermodynamics and emergy. First data on the energy investment in the electricity production system were sought. Then data were converted from energy to exergy multiplied the results by their transformities, obtaining the following: "free" renewable energy sources (7.29 E +05 sej / year), renewable source of energy purchased (3.12 E +03 sej / year), non-renewable sources of energy purchased (1.39 E +05), "free" non-renewable energy sources "(9.40 + E 06 sej / year), non-renewable sources of energy purchased (1.39 E +05 sej / year), energy related environmental impacts (biomass lost 4.04 E +05 sej / year), energy related investments of $ 19, 25 and 30 billion (5.7 E +20 7.5 E +20 sej a nd 9E +20 / year). It was include these investments, which contains data from the Investment Physical searched and those who were not physically possible to quantify, such as environmental costs, social, some materials and equipaments. From these data, emergy indices (EIR, EYR, ELR, ESI and Tr) were calculated. Belo Monte CHE is relatively efficient even in your scenario of $ 30 billion, with Tr equal to 1.35 E +04 sej / J. Energy Rate of Return on Investment was calculated for two situations: with or without the non-renewable energy free (N). As the EROI depends on all the energy inputs and not particularly of N, there was no significant difference between the two situations analyzeden
dc.publisher[s.n.]pt_BR
dc.date.issued2010pt_BR
dc.identifier.citationMORELLI, Mariana Marques. Avaliação energética e emergética de usina hidrelétrica - estudo de caso = complexo hidrelétrico de Belo Monte - Rio Xingu. 2010. 121 p. Dissertação (mestrado) - Universidade Estadual de Campinas, Faculdade de Engenharia Mecânica, Campinas, SP. Disponível em: <http://www.repositorio.unicamp.br/handle/REPOSIP/262926>. Acesso em: 17 ago. 2018.pt_BR
dc.description.degreelevelMestradopt_BR
dc.description.degreenameMestre em Planejamento de Sistemas Energéticospt_BR
dc.contributor.committeepersonalnameCavaliero, Carla Kazue Nakaopt_BR
dc.contributor.committeepersonalnameSinisgalli, Paulo Antonio de Almeidapt_BR
dc.date.available2018-08-17T16:42:40Z-
dc.date.accessioned2018-08-17T16:42:40Z-
dc.description.provenanceMade available in DSpace on 2018-08-17T16:42:40Z (GMT). No. of bitstreams: 1 Morelli_MarianaMarques_M.pdf: 2990993 bytes, checksum: 213be4a8f053870f4ec07fb6a9f9a927 (MD5) Previous issue date: 2010en
dc.identifier.urihttp://repositorio.unicamp.br/jspui/handle/REPOSIP/262926-
Appears in Collections:FEM - Tese e Dissertação

Files in This Item:
File SizeFormat 
Morelli_MarianaMarques_M.pdf2.92 MBAdobe PDFView/Open


Items in DSpace are protected by copyright, with all rights reserved, unless otherwise indicated.