Please use this identifier to cite or link to this item: http://repositorio.unicamp.br/jspui/handle/REPOSIP/258728
Type: DISSERTAÇÃO
Degree Level: Mestrado
Title: Fatores que desencadeiam desvios de custos e prazos : estudo no subsetor de edificações de Moçambique
Title Alternative: Factors of cost and time overruns : study on the subsector of Mozambique edifications
Author: Muianga, Elisa Atália Daniel, 1985-
Advisor: Granja, Ariovaldo Denis, 1963-
Abstract: Resumo: Desvios de custos e prazos ainda são um grande desafio na construção civil. A execução do empreendimento é muitas vezes repleta de atrasos e custos adicionais, causados por vários fatores, que acabam encarecendo a construção. Em determinados países como Moçambique, as causas específicas não são verdadeiramente conhecidas, existem apenas percepções intuitivas e fragmentadas sobre os fatores que influenciam estes desvios. O objetivo desta pesquisa é apurar os fatores críticos que mais contribuem para a ocorrência de desvios de custos e prazos em empreendimentos do subsetor edificações de Moçambique. Para a busca de resultados de estudos primários, foi utilizada a Systematic Literature Review (Revisão sistemática de literatura ¿ RSL). Informações relevantes foram extraídas dos artigos selecionados e, posteriormente, sintetizadas para determinar uma estrutura de categorização e respectivos fatores responsáveis por estes desvios. A literatura existente até o momento sobre desvios de custos e prazos se mostrou multifacetada, com 92 artigos publicados em 46 fontes diferentes. A maioria das pesquisas teve como foco o estudo de alguns destes fatores em particular, enquanto que esta pesquisa procurou classificá-los e sintetizá-los de forma a possibilitar uma visão mais abrangente sobre o fenômeno. Assim, nove categorias foram identificadas e propostas com base em seus determinantes: (i) atividades e equipamentos; (ii) gerenciamento; (iii) projeto e documentação; (iv) financiamento; (v) aspectos ambientais e econômicos; (vi) organização; (vii) contratos; (viii) alterações de escopo e (ix) relações governamentais. Além disso, 95 fatores de influência para a ocorrência destes desvios foram identificados e anexados às categorias pertinentes. Após a RSL, o método de pesquisa para a sequência deste estudo é o Survey. Para isso, foi aplicado um questionário para determinação da relevância dos fatores de desvios de custos e prazos obtidos por meio da RSL, junto a 272 construtoras moçambicanas. Os resultados apresentaram 20 fatores estatisticamente relevantes para a ocorrência de desvios em empreendimentos moçambicanos. Com base nos fatores, foram apresentadas diretrizes para a redução dos impactos que esses fatores causam durante os empreendimentos que poderão ser validadas em estudos futuros

Abstract: Cost and time overruns are recurrent challenges in construction projects. In project implementation there are often delays and additional costs caused by several factors that increase the budget of construction. In Mozambique, the underlying causes related to this issue are not well understood. This study is a first attempt to determine the influence factors of cost and time overruns in this context. This research aims to find the influence factors that contribute to the occurrence of cost and time overruns, and to establish their criticality in Mozambican construction projects. A systematic literature review (SLR) was carried out in a methodic fashion to ensure it is scrutinizingly and repeatable. Relevant information was extracted from the selected articles and subsequently synthetized in order to categorize and identify the influence factors, which trigger time and cost overruns. The literature on time and cost overruns in construction is contrasting with 92 articles from 46 different reference sources. Most research has focused on the study of some of these factors in particular, while this research sought to classify and synthesize the factors in order to enable a new and more comprehensive view of this phenomenon. Nine categories were identified and defined on the basis of their determinants: (i) activities and equipments; (ii) management; (iii) design and documentation; (iv) financing; (v) environmental and economic; (vi) organization; (vii) contracts; (viii) scope changes and (ix) governmental relations. Moreover, 95 influencing factors were identified and classified accordingly. A survey has been designed to collect data from construction managers in Mozambique in 272 Mozambican constructions, seeking to find out the critical influence factors related to cost and time overruns. The results showed 20 relevant factors for the occurrence of cost and time overrun in Mozambican construction. With the basis of factors, guidelines were presented for reducing the impact that these factors cause for the enterprises that can be validated in future studies
Subject: Construção civil - Custos
Moçambique
Editor: [s.n.]
Citation: MUIANGA, Elisa Atália Daniel. Fatores que desencadeiam desvios de custos e prazos: estudo no subsetor de edificações de Moçambique. 2015. 214 p. Dissertação (mestrado) - Universidade Estadual de Campinas, Faculdade de Engenharia Civil, Arquitetura e Urbanismo, Campinas, SP. Disponível em: <http://www.repositorio.unicamp.br/handle/REPOSIP/258728>. Acesso em: 18 mar. 2019.
Date Issue: 2015
Appears in Collections:FEC - Tese e Dissertação

Files in This Item:
File SizeFormat 
Muianga_ElisaAtaliaDaniel_M.pdf6.02 MBAdobe PDFView/Open


Items in DSpace are protected by copyright, with all rights reserved, unless otherwise indicated.