Please use this identifier to cite or link to this item: http://repositorio.unicamp.br/jspui/handle/REPOSIP/108278
Type: Artigo de evento
Title: Attending Small Loads Along A Half-wavelength Transmission Line
Author: Tavares M.C.
Torquato R.
Abstract: This paper presents some results on a Transmission Line a little greater than the Half-Wavelength (HWL+) attending small loads. A non-conventional 800 kV line with 2600 km with natural power of 4.8 GW was analyzed. The studies consisted in analyzing the capacity of this AC-Link feeding some small loads. The results confirm that this transmission is rather robust and can operate with small load drainage along its length. © 2011 IEEE.
Editor: 
Rights: fechado
Identifier DOI: 10.1109/EPEC.2011.6070207
Address: http://www.scopus.com/inward/record.url?eid=2-s2.0-82955172997&partnerID=40&md5=c9055b0b8fd572b8d44191973804d308
Date Issue: 2011
Appears in Collections:Unicamp - Artigos e Outros Documentos

Files in This Item:
File SizeFormat 
2-s2.0-82955172997.pdf458.78 kBAdobe PDFView/Open


Items in DSpace are protected by copyright, with all rights reserved, unless otherwise indicated.