Please use this identifier to cite or link to this item: http://repositorio.unicamp.br/jspui/handle/REPOSIP/332720
Type: DISSERTAÇÃO DIGITAL
Degree Level: Mestrado
Title: Dificuldades observadas na adoção do programa Manutenção Produtiva Total (TPM)
Title Alternative: Difficulties observed when implementing Total Productive Maintenance program (TPM)
Author: Arromba, Iara Franchi, 1992-
Advisor: Anholon, Rosley, 1979-
Abstract: Resumo: A busca constante por melhoria competitiva e lucratividade empresarial fez com que atividades de manutenção evoluíssem de ações corretivas para ações integradas corretivas, preditivas e preventivas. Como ferramenta de melhoria contínua, a Manutenção Produtiva Total ou Total Productive Maintenance visa aumentar a confiança no equipamento e eficiência de gestão em todos os níveis de trabalho, integrando produção, manutenção e engenharia. Porém, muitas organizações encontram dificuldades em implantar com sucesso esse modelo estratégico de manutenção, devido à diversas complexidades. O objetivo principal da pesquisa está relacionado à tentativa de comprovar que as dificuldades associadas à adoção do programa TPM se dividem em dois grupos, sendo eles dificuldades associadas à fase de planejamento e dificuldades associadas à fase de implantação. A elaboração e divisão das dificuldades nesses dois grupos foi realizada via painel de especialista, conhecido como Técnica de Grupo Nominal. Para a coleta de dados, foi realizada uma survey com profissionais de empresas brasileiras responsáveis pelo planejamento e implantação do programa em sistemas produtivos. Os dados obtidos foram tratados via análise fatorial confirmatória de segunda ordem por meio da modelagem de equações estruturais, mais precisamente por meio da técnica PLS-SEM. A PLS-SEM pode ser entendida como uma técnica de modelagem para fins exploratórios, sendo chamada de soft modelling. Estudos iniciais apontaram a necessidade de uma amostra mínima de 55 respondentes. Foram obtidas um total de 69 respostas de profissionais de diferentes áreas de atuação, cargos e anos de experiência com o programa TPM. Os resultados obtidos confirmaram a relação causal entre as dificuldades na fase de planejamento e as dificuldades observadas na fase de implantação. Os resultados decorrentes desta dissertação são de extrema valia tanto para profissionais de manutenção e produção quanto para pesquisadores interessados no tema em suas futuras pesquisas

Abstract: The search for competitiveness and business profitability led to an evolution of maintenance activities from previously only corrective actions to integrated corrective, predictive and preventive plans. As a continuous improvement tool, Total Productive Maintenance increases confidence and improve work levels by integrating production, maintenance and engineering sectors. However, many organizations face problems in successfully deploying this strategic maintenance model due to various complexities. The main objective of the research is related to the attempt to prove that the difficulties associated with the adoption of the TPM program can be divided into two groups, difficulties associated with the planning phase and difficulties associated with the implementation phase. An elaboration and division of the difficulties in these two groups was carried out by panel of specialists, known as Nominal Group Technique. For data collection, a survey was conducted with professionals from Brazilian companies responsible for planning and implementing the program in productive systems. The data were treated using a second-order confirmatory factorial analysis using the structural equation modelling, more precisely through the PLS-SEM technique. PLS-SEM can be known as a modeling technique for exploratory purposes, whether it is called soft modeling. Initial studies indicated the need for a minimum sample of 55 respondents. A total of 69 responses were obtained from professionals in different areas of performance and years of experience with the program TPM. The results confirmed the causal relationship between the difficulties in the planning phase and the difficulties observed in the implantation phase. The results of this dissertation are of extreme value for maintenance and production professionals as well as for researchers interested in the subject in their future research
Subject: Manutenção produtiva total
Planejamento
Administração da produção
Language: Português
Editor: [s.n.]
Date Issue: 2018
Appears in Collections:FEM - Tese e Dissertação

Files in This Item:
File SizeFormat 
Arromba_Iara Franchi_M.pdf1.45 MBAdobe PDFView/Open


Items in DSpace are protected by copyright, with all rights reserved, unless otherwise indicated.